TUCKER HOSTEL, NCYPE, LINGFIELD
Client:- NCYPE
(National Centre for Young People with Epilepsy)
Value:- £400,000
Programme:- 24 weeks
Description of the Works:-
The works comprised the
total refurbishment of the Tucker Hostel located within the grounds of NCYPE.
The existing blockwork partitions (some loadbearing) were stripped out, the roof
temporarily propped and new steelwork supports installed. New robust studwork
partitions were then constructed to form 10No. bedrooms and ensuites to
facilitate the disabled children. A completely new electrical and heating system
was installed as designed by Lee Evans Partnership. A substantial amount of new
internal below ground drainage had to be installed to accommodate the new
en-suites including grading the solid floors to provide walk in shower areas.
New floor finishes were installed throughout as indicated by the Design Team.
»
2ND FLOOR, SWAH, EPSOM
Client:- Atkins
Ltd
Value:- £165,000
Programme:- 5 weeks
Description of the Works:-
Part of the 2nd floor at
Sir William Atkins House (SWAH) was refurbished as required by the client
(Atkins Ltd). The existing carpets were stripped up and renewed including the
relocation/installation of new floor boxes. New Polar full height glazing was
installed to form new offices and a conference room as designed by Atkins. Also
new lighting was installed which included the renewal of the ceiling to some of
the offices. A new AC unit was installed to the conference room and designed
graphics installed to some of the wall areas.
»
THE WELLS REFURBISHMENT, EPSOM
Client:- Atkins
Ltd
Value:- £1,300,000
Programme:- 20 weeks
Description of the Works:- The works comprised
the total refurbishment of this Atkins owned 3 storey office building. Each
floor plate was totally stripped out and then subsequently fitted out including
new ceilings, flooring, partitions etc. including a total refurbishment of the
M&E systems. The common areas, including stairwell, reception and toilets, were
also refurbished to a high standard to meet the specification as stipulated by
the Atkins Design Team. Several specialist contractors were employed as named by
the client to install the high class graphics and fixtures. The external of the
building was overhauled by carrying out decorations and the specialist cleaning
of the pre-finished glazed facade and windows.
»
JET CENTRE EXTENSION, LONDON CITY
AIRPORT
Client:- London City
Airport
Value:- £ 320,000
Programme:- Total 12 weeks (phased)
Description of the Works:-
The base preparation for the installation of
the modular extension including groundworks and drainage. Once the modular
building had been installed into position then the complete fit out was carried
out.
The works comprised the following:-
Concrete foundations and drainage
External surfacing
New partitions
Khaya veneer doors and high quality joinery
Suspended ceilings
Floor finishes
Mechanical & electrical works
Fit out of toilets
Vinyl wallcoverings
»
BLUEBIRD PLACE, LEATHERHEAD
Client:- Atkins
Value:- £ 260,000
Programme:- Total 10 weeks
Description of the Works:- Refurbishment of the IT building for Atkins to
upgrade the main reception area and to enhance the finishes. Also new state of
the art furniture was installed in accordance with the requirements of the
interior designer. The works comprised the following:-
New specialist glazed partitions
Suspended ceilings
Designer furniture and fittings
Mechanical & electrical works
Toilets / shower works
Decorations
New Kitchen area
»
VISITORS CENTRE, HEATHROW AIRPORT
Client:- Interserve / BAA
Value:- £ 350,000
Programme:- Total 12 weeks
Description of the Works:-
Fit out of the new Visitors Centre in
accordance with the Architect’s high spec finishes. Works were carried out to
both ground and first floors. The works comprised the following:-
New sound rated partitions
Suspended ceilings
New specialist dividing walls to the exhibition centre
Floor finishes
Decorations
New Kitchen area
»
CONSTRUCTION OF NEW SPORTS PAVILION,
BILLINGSHURST
Client:- Billingshurst
Parish Council / Horsham District Council
Value:- £ 650,000
Programme:- Total 26 weeks
Description of the Works:- Design and Build of a new sports pavilion comprising
changing rooms, showers/toilets and a function room including a bar area. The
building was constructed on a green field site under the jurisdiction of HDC.
The works comprised the following:-
Concrete foundations
Steel portal frame with mezzanine area
Brick/block cavity walls
Decra tiled roofing
New sewage treatment plant including all drainage
Mechanical installations including fresh air ventilation and underfloor heating
Electrical installations comprising a fire and security alarm system
» REFURBISHMENT
OF TOILETS AND CHECK IN DESK, LONDON CITY AIRPORT
Client:- London City Airport
Value:- £1,000,000
Programme:- Total 24 weeks
Description of the Works:- The works included the addition of 6No.
check-in-desks to the main terminal. The next phase then included the staggered
completion of the main toilet areas to the satisfaction of the client. The works comprised the following:-
Attendance on the installation of
desks and baggage belts (CID)
Installation of specialist terrazzo flooring (CID)
Installation of panels and cubicles
Wall and floor tiling
Suspended ceilings
Mechanical and Electrical Installations
Installation of services and associated sanitaryware
» CONSTRUCTION
OF WELFARE FACILITIES, BMW PLANT, OXFORD
Client:- BMW
Value:- £1,400,000
Programme:- 20 weeks
Description of the Works:- To carrying out the construction of new welfare
facilities for manual workers in preparation of the new Mini launch. The project
included the construction of smoking rooms, amenity areas, toilets and offices.
The programme was ‘non-flexible’ as the whole of the works had to be
completed for the launch date. The works mainly comprised the following:-
Powder coated metal partitions
Suspended ceilings
Vinyl/ceramic tiled flooring
Suspended ceilings
Mechanical and Electrical Installations
Kitchen and servery fit out including the installation of specialist equipment
Toilet fit outs including all services and sanitaryware
Decorations
» FIT
OUT OF OFFICES & FORMATION OF CAR PARK, ROCC COMPUTERS
Client:- ROCC Computers, Crawley
Value:- £720,000
Programme:- 16 weeks
Description of the Works:- To carrying out the refurbishment and fit out of
offices to enable our client to move the whole of their operation into these
premises. The works comprised the following:-
Demolition
Partitions
New single membrane roofing
Mechanical and Electrical Installations
New toilets
Floor coverings throughout
Decorations
External works comprising the formation of 85 car parking spaces
» FORMATION
OF NEW HAAGEN DAZS CAFÉ, THISTLE TOWER HOTEL
Client:- Thistle Hotels
Value:- £340,000
Programme:- 8 weeks
Description of the Works:- To carrying out the formation of a new Haagen Dazs
café within an exposed shell beneath the Thistle Tower Hotel. The project
entailed the installation of substantial steel beams to support the integrated
glazed curtain walling. The works mainly comprised the following:-
Steelwork/stainless steel
flashings
Glazed curtain walling
Mechanical and Electrical Installations
Kitchen and servery fit out including the installation of specialist equipment
Timber hard wearing flooring
Specialist drainage
Decorations
External stainless steel handrails
» FIT
OUT OF CITY NET BUILDING AND REFURBISHMENT OF LEDGER BUILDING, LONDON CITY
AIRPORT
Client:- London City Airport
Value:- £610,000
Programme:- 10 weeks
Description of the Works:- Fast track fit out of industrial unit and
refurbishment of character building within the airport's boundary. The project
included a full range of trades comprising the following:- Partitioning
Specialist floor coatings
Suspended ceilings
Floor finishes
Ashphalt roofing including parapet capping
Toilet / shower fit out
Mechanical and electrical works including fire alarm system linked to airport's
main system
» REFURBISHMENT
OF PACIFIC HOUSE OFFICE BUILDING, CRAWLEY
Client:- British
Airways
Value:- £350,000
Programme:- 10 weeks
Description of the Works:- Total refurbishment of 4no. floors to office
building. The works comprised renewal of suspended ceilings / flooring and finishes including the
upgrading of mechanical and electrical. The works included the following:-
Renewal of metal suspended
ceiling tiles and flooring finishes throughout
Refurbishment of toilet area
Upgrade of mechanical plant
Improvement of electrical services
Decoration throughout
» INSTALLATION
OF FIRE RATED HOARDINGS, PIER 3 SEGREGATION, SOUTH TERMINAL, GATWICK AIRPORT
Client:- ROK
Group
Value:- £186,000
Programme:- 24 weeks
Description of the Works:- Construction of 1 hour fire rated hoardings (BAA
standard) to encompass the fit out works. Also the construction of shaft walls
inclusive of all access equipment. Most of the works were carried out between 10.00pm
to 4.00am.
|